We had asked the builder to give us a better design for the basement and we wanted to make sure there would be enough light should we decide at some point to put in another bedroom or rec room.  So, he did that.

I’ve been told that the new sewer has been installed.  Gloucester requires a STEP system that churns up the waste and pumps it into the sewer pipe in the street.  This unit is under the driveway in front of the house.  The only way you’ll notice it will be the 2 manholes.  I”m glad that’s done.  I was hoping they weren’t going to run into any more ledge and make that difficult.  They are supposed to finish grading and start framing next week!  Still no word from National Grid.